E&I Department

ELECtrical & INSTRUMENTATION

NOTICE BOARD

21.03.2025

 

  • For GShift8 employees should reached at site before 8 am from 22.3.25 onwards
  • Tool box meeting should start at 8.15 am daily near Pellet-2 Transformer area.All must be present in tool box meeting.

SHIFT CORRECTION FORM

EXTRA DUTY FORM

SHIFT CORRECTION SHEET

EXTRA DUTY SHEET

MCC Panel Drawing

MCC Panel drg_TG Up deck roller Screen

MCC Panel drg_Annular Cooler

MCC Panel drg_Balling Disc MCC

MCC Panel drg_Benification MCC-1

MCC Panel drg_Pellet Pump House

MCC Panel drg_Burdening Mcc

MCC Panel drg_Benification Pump house

MCC Panel drg_Benification MCC-2

MCC Panel drg_Pellet-1 TG Mcc

MCC Panel drg_Thickner-1 Mcc

MCC Panel drg_RHMS Mcc

Vfd Panel Drawing

Vfd Panel drg_P-1 Cooler Main drive-1

Vfd Panel drg_P-1 Cycle Cooler Fan

Vfd Panel drg_P-1 Disc Feeder

Vfd Panel drg_P-1 Disc Granulator

Vfd Panel drg_P1_ID FAN 1

Vfd Panel drg_P1 ID FAN 2